Shedden – Replace section of foundation

Moodie 07 2016 formed 2Moodie 07 2016 east pouredwall of 2 story brick house was sinking, we’re jacking, supporting, straightening floors and installing a new section of wall 18” thick.

Watch for the restoration of the original stonework!