Renovations - Residential, Agricultural, Commercial - Serving London and Surrounding Areas

Transformation !

Transformation!

Before: Deteriorating concrete

After: Beautiful, Safe! Thanks Jim VanderLindenDeck 2017 10 15 before

A Few Metcalfe Windows Before Pictures

Metcalfe Hall Before 06 26 17 east Metcalfe Hall Before 06 26 17 southThese were Pella windows from about 1989 with their double glazing system (not thermopane). A good  system in it’s time, but not really thermally efficient by today’s standards. As well, operator hardware was causing problems. Heating costs will be reduced and comfort improved with the new insulated frame windows.

Replacement windows!

Metcalfe Hall Windows 06 26 17 north Metcalfe Hall Windows 06 26 17 south Metcalfe Hall Windows 06 26 17 down outside Metcalfe Hall Windows 06 26 17 down inside
New windows at church hall 1697 Melwood Dr. Adelaide Metcalfe township
Vinyl frame, low E, Argon, Interior jamb extension, reuse existing trim, foam insulated
Windows supplied by JH Windows of Wardsville (info@bentandersen.ca)

Benefit from my mistake!

 

Spring deck building ? Beautiful solid pine!pine-stairs-3

2 sets pine stairs total width 9’6” +-, total rise  1 at 30”, 1 at 28”  We ordered wrong  🙁

Make  us an offer, you’ll be pleasantly surprised!   519-668-9996

 

campbell-pumps-afteer campbell-pumps-before campbell-crawlspace-before-12-05-2016-2 campbell-microfoil-crawlspace-2 campbell-microfoil-crawlspace campbell-stair-before campbell-stair-after campbell-ezbreathe Campbell crawlspace and basement encapsulation. It’s evident which are before and which are after pictures, not? 🙂

Retaining wall, Tub conversion

beginning retaining wall between crawl space and basementcampbell-retaining-wall-12-02-2 campbell-retaining-wall-12-02 clark-tub-door-08-25-2 clark-tub-door-08-25-seat-1 Converting tub to walk in showerTub to walk in showerclark-tub-door-08-25-seat-2 clark-tub-door-08-25-seat-3

Shedden – Replace section of foundation

Moodie 07 2016 formed 2Moodie 07 2016 east pouredwall of 2 story brick house was sinking, we’re jacking, supporting, straightening floors and installing a new section of wall 18” thick.

Watch for the restoration of the original stonework!